    Builders were Relieved

    The challenges of installing a complex glass façade were formidable. With no easy internal access, a traditional scaffold installation was deemed too weighty and would inadvertently chew up time on the important works program.

    It seemed like an impossible task; however, the creative minds of the engineering team at Standard Access found a solution that was worthy of applause.

    What they came up with was an innovative, lightweight transportable solution known as a 35m Twin Mast Climber that proved to be the ideal candidate for the job. With its slim line design, it provided all the access the installers needed for proper glass placement whilst being able to reach the required heights without overly impeding on the constraints of the program.

    This engineering solution didn’t just stop there. The customized spandrel ties that were designed to be used in conjunction with this climber not only ensured that the glass panels were safe and secure but there was also zero scaring to the façade throughout the process. The 35m Twin Mast Climber combined with the engineered spandrel ties truly proved to be a successful solution in ensuring the completion of an impressive façade installation.

    This case study highlights the triumphs made possible through engineering – all whilst being under budget and on time!

    Are you facing a similar challenge with your complex façade project? Contact us today for a tailored engineering solution.